Integrated Services |
Geophysics |
Geotechnical Surveying |
Drilling |
Drilling Rigs |
Module Drilling Rigs |
Tubing & Casing Running Services |
Oil Tools |
Equipment Support Services |
Directional Drilling |
Logging |
Drilling & Completion Fluids |
Water-based Drilling Fluid Systems |
Nonaqueous Drilling Fluid Systems |
Drill-in and Completion Fluid Systems |
Deep water test fluid |
Drilling and Completion Fluid Engineering Software |
Lost circulation prevention and plugging technology |
Drilling Fluid Equipment |
Drilling &Completion Fluids Additives |
Cementing |
Well Cementing Technology |
Well cementing casing accessory and tool |
Cementing simulation software system |
Well cementing chemicals |
Offshore cementing equipment |
Onshore cementing equipment |
Workover |
Production and Optimization |
Low-permeability Fracturing Service |
Service of Plugging Removal by Acidizing |
Heavy Oil Recovery Service |
EORService |
Oil And Water Treatment Service |
Coiled Tubing and Nitrogen Services |
HYSY640 Stimulation Vessel and HYSY 696 Large Integrated Fracturing Vessel |
Geological&Reservoir |
Integrated G&R services |
Integrated Geology & Reservoir Analysis Technology |
Geology & Reservoir Analysis Technology for Heavy Oil Recovery |
Geology & Reservoir Analysis Technology for Enhanced Oil Recovery |
Well Completion |
Production Tools |
Ultra HPHT Completion Tools |
Sand control completion |
Screen |
Intelligent Completion |
Heavy oil thermal recovery completion tool |
CCUS/CCS Well Completion Technology |
Artificial lift |
The Completion Experiment and Testing Center |
Completion tool service |
Ground services |
Liftboats & Accommodation Rigs |
Marine Support Vessels |
Unconventional Resources |
Customer Appreciation |
Business World-wide |
EPS |
Water-based drilling fluid/cuttings reduction treatment technology |
Non-water based drilling fluid/cuttings reduction technology |
Well Completion Waste Treatment Technology |
Oily sludge treatment technology |
EPS Treatment Additive |
Cementing Engineering Technical Services |
The HYSY 640 vessel was independently constructed and launched in 2014 as the first offshore oilfield simulation vessel in China. It pioneered a new dual-support fracturing model in our country, combining “platform + simulation vessel,” which provides a flexible and reliable extension support carrier for large-scale offshore fracturing operations. The vessel's integrated design perfectly embodies the concept of “small layout, large project” for offshore simulation activities, without occupying platform space. It offers clients high-quality and efficient integrated services for maritime fracturing, acidizing, and sand prevention. Additionally, the vessel is equipped with a DP-2 dynamic positioning system, enabling it to operate effectively even in harsh environmental conditions.
As of October 2024, HYSY640 stimulation vessel has supported over 100 well-times of acidizing operation, more than 800 fracturing and fracturing filling operations, with cumulative supporting service of over 1800 days, and the equipment is outstanding in performance, high maneuverability, with better construction effect.
Total Length | 81.15m |
Molded Breadth | 18m |
Molded Depth | 7.4m |
Endurance Capacity | 6000 n mile |
Main Generator Power | 1972×4HP |
High-Pressure Pump System | 2000HP×6 |
Proppant | 120m3 |
Liquid Storage Capacity | 1000m3 |
To meet the demands of large-scale development in offshore low-permeability reservoirs, in 2022, CNOOC took the lead in constructing the HYSY696, a large integrated fracturing vessel. This vessel is equipped with five 5000 HHP electric-driven fracturing pumps, achieving a maximum pumping power of 18.63 MW, ranking first globally. It has a maximum pumping capacity of 12.7 m³/min, ranking second in the world. Additionally, it features a storage capacity for fracturing materials of 1,260 tons, also ranking second globally. This vessel enables comprehensive large-scale volumetric fracturing of offshore low-permeability oil and gas fields.
China Oilfield Services Limited (COSL) participated comprehensively and throughout the entire process of the design and construction, conducting systematic research on the key technologies for large fracturing vessels and their safe operation. This provides solid technical support for the orderly advancement and safe operation of the construction project. The vessel is expected to be delivered to COSL for operation in 2025.
Total Length | ≈100m | Total hydraulic Power | 20000HHP |
Molded Breadth | ≈22m | Maximum Pressure | 15000Psi |
Molded Depth | ≈10m | Continuous Mixing | ≥12m3/min×1 |
Main Generator Power | ≈28700kw | Sand mixing Equipment | ≥12m3/min×2 |
High-Pressure Pump System | 5000HP×5 | Positioning System | DP-2 |
Proppant | ≥600m3 | Endurance Capability | 10000 n mile |
China Oilfield Services Limited (COSL) is the leading integrated oilfield services providers in the Asian offshore market. COSL’s four main services divisions—Geophysical Services, Drilling Services, Well Services, and Marine and Transportation Services—cover the exploration, development, and production phases of the oil and gas industry.
2015 China Oilfield Services Limited All Rights Reserved Record Number: Tianjin ICP NO. 17008252